Installation of an HVPD Kronos® Monitoring System for Critical 400 kV Onshore Cable Links to the Grid from an Offshore UK Windfarm
Read more
On-line Partial Discharge Testing of 110 kV Grid Connection Transformer Cable Terminations at a European Oil Refinery
Read more
Fault Location on a 33 kV Subsea Cable Leading to Repair
Read more
On-Line Partial Discharge Testing and Pinpointing (Location) on a 33 kV Offshore Wind Farm Export Cable
Read more
On-line Partial Discharge Testing and Cable Mapping of 33 kV XLPE Cables in a Light Rail System
Read more