Handheld on-line PD 'surveying' tool for rapid, 'look-see' insulation condition testing of medium voltage plant in the voltage range 6.6kV to 45kV. Unique technology which incorporates three types of PD sensor (HFCT, TEV and Acoustic) for testing cables and plant.
Read more…
|
|
|
Universal, 4-Channel Diagnostic PD Tester with synchronous capture of data on all channels (to within 2ns) for accurate PD diagnosis. Suitable for synchronous, multi-channel testing of all types of mv and high voltage (hv) plant up to 500kV. Can be used for either short-duration (5-10 minute) PD 'spot' tests or for short-term PD monitoring (typically over 1 to 24 hours).
Read more…
|
|
|
PDMap© - On-line Cable PD Mapping Expansion System On-Line Partial Discharge Mapping (PD Location) expansion system for the HVPD Longshot™ unit to enable on-line PD mapping of both mv and hv cables up to 500kV. Includes the HVPD Portable Transponder and PDMap© Software, to enable the location of PD sites along cables of up to 5km in length.
Read more…
|
|
|
This is a 4-Channel, remote-access PD logging technology with built-in GPRS (3G) modem. Suitable for both short-term PD monitoring (typically 1-2 weeks) and medium-term PD monitoring (up to 6 months) of medium voltage cables and plant in the voltage range 6.6kV to 45kV.
Read more…
|
|
|
16-Channel, portable remote-access, multiplexed PD monitor technology with built-in Ethernet/LAN and HSDPA (3G) modem. Suitable for continuous, short-term (1 week) and medium-term (up to 3 months) PD monitoring of all types of mv plant and cables in the voltage range 6.6kV to 45kV.
Read more…
|
|
|
The permanent version of the HVPD Multi™Monitor technology is supplied as a 16-Channel Base Unit (shown opposite) with extendibility up to 64 channels with up to 3x16-channel expansion units. This multiplexed PD monitor technology of up to 64 channels is interconnected between units and to the customer's Ethernet/LAN network through Ethernet connections to minimise cabling. Suitable the long-term (> 3 months) PD monitoring of all types of mv plant.
Read more…
|
|
|
HVPD 4-Phase PD Test & Monitoring Solution HVPD present an integrated, 4-phase, condition-based asset management solution which combines the complete HVPD range of technology including PD surveying (Phase 1), diagnostic 'spot testing' (Phase 2), PD monitoring technology. The solution provides a suitable framework for the implementation of a systematic and cost effective, condition-based asset management system which can identify, locate and monitor PD activity within the customer's network.
Read more…
Download Better Asset Management Guide
Download HVPD 4-Phase PD Test & Monitoring Solution Document
|
|
HVPD also provide a wide range of both on-line and off-line Partial Discharge (PD) Test Services to an increasing number of mv and hv clients around the world. PD Testing Services are carried out by our team of highly-trained PD Test Engineers who utilise the versatile, on-line HVPD Longshot™ Diagnostic PD Test Technology, the HVPD PDMap© Cable Mapping System and a range of On-line PD Sensors depending on the mv or hv plant to be tested.
Recent PD Test Projects include:
On-line and Off-line PD Testing of: